> ## Documentation Index
> Fetch the complete documentation index at: https://docs.trellistech.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Tasks, visits, and completion review

> How a task differs from a visit, and how to review completed work against its evidence

## What this helps you do

Read operational work the way Trellis structures it — tasks inside visits —
and review completions so "done" always means verifiably done.

## Task versus visit

A **task** is one unit of work with its own instructions, checklist, and
proof requirements: fix this lockbox, run this turnover clean.

A **Visit** is a worker's bundle of work at one property for one day. When a
task is scheduled and assigned, it lands on a visit — the worker's view of
"what am I doing at this property today." One visit can carry several tasks;
one task always belongs to the property and timing that scheduled it.

The distinction matters when reading status: a task that never got done may
have failed on its own terms, or its visit may never have happened at all —
different problems with different fixes. A missed visit is a scheduling or
staffing issue; a failed task inside a completed visit is a work-quality
issue.

## Review a completion

<Steps>
  <Step title="Compare proof against requirements">
    Open the completed task and put the attached evidence next to what was asked: every checklist
    item checked, every **Photo required** item backed by a photo showing what the instructions
    demanded.
  </Step>

  <Step title="Accept or decline with a reason">
    **Accept** when the evidence carries the completion. **Decline** when it does not — and say
    specifically what is missing or wrong, so the redo is one trip instead of a guessing game.
  </Step>

  <Step title="Separate failed from never doable">
    Before declining, ask whether the task could have been done as written. Wrong code in the
    instructions, a guest still in the unit, a part that does not exist — those are failures of the
    task, not the worker. Fix the task and reschedule rather than declining the person who reported
    honestly.
  </Step>
</Steps>

## Why reviews are worth the minutes

Reviewed completions are the record every quality number is built on. A
completion accepted without its evidence poisons that record silently — the
metric says the work happened, and nobody can later prove it did. The
standards for setting proof requirements up front are in
[Create a task that comes back done right](/guides/create-a-task).
